Sk610X2030 supplier made in China replacement parts in Belo Horizonte Brazil Automatic PP Film Open Mixing Mill Machine with top quality

Sk610X2030 supplier made in China  replacement parts  in Belo Horizonte Brazil Automatic PP Film Open Mixing Mill Machine with top quality

We – EPG Group the greatest gearbox & motors , couplings and gears manufacturing facility in China with 5 diverse branches. For far more information: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

1. Business Data
     Founded in 1992, HangZhou Lanhang Machinery Co., Ltd. is a private company integrating scientific study, production, marketing and advertising and services of plastic equipment into a single total entire. 
 
     Our “Lanhang” model of planetary roll extruders, straining extruders, effective horsepower dense mixers, mixing rolls, and substantial-pace mixers are the spine of our firm. 
 
     we sincerely welcome clients to cooperate with us to create satisfying company partnerships.
Product Description
 
two. Characteristics:
       1. prolonged provider daily life
       2. straightforward operation 
       3. excellent final results
       4. east maintence
       5. practical of worn-out parts
 
three. Description:
one. Applitation 
Used for plastic plasticizing, calendering and urgent.
2. Primary Technological Parameters:

ProjectModel SK400*a thousand SK450*1200 SK560*1830 SK610*2030 SK660*2300 SK760*2800
Entrance/back roll diameter(mm) 400 450 560 610 660 760
Wor ept length(mm) one thousand 1200 1830 2030 2300 2800
Principal motor electrical power(kw) 45 fifty five seventy five ninety 132 220
Reucer speed box Hard toothed
Variety of push Cardan shaft

 
3) Equipment lists:

No. Item Quantity
one Roller 2 pc
2 Temperature controlling device 2 set
3 Machine bed 1 set
four Nip adjusting device 1 set
5 Blocking device 1 set
six Cutting device 1 set
7 Stock pan 1 set
eight Speed reducer 1 set
9 Reducer lubricating system 2 set
ten Emergency brake, safety device 2 set
11 Control system 1 set
twelve Main motor 2 set

 
Packaging & Shipping and delivery
 
one. Payment: 30% by T/T as down payment money, balance (70%) by T/T before shipment.
2. Lead Time: 90 working days after receiving the down payment money.
three. Package: PE film, pallet at the bottom (if necessary).
Our Services
 
one. Warranty period: From the day of the use of the machine in the buyer’s factory:
   (1) The mechanical Parts: 12 months
   (2)The electrical Parts: 6 months
 
2. Installations and Commissioning
  (1)Up to date commissioning has been made before shipment
  (2)Overseas Commissioning and charges:
0ne or two technicians will be sent to the buyer to guide the installation and commissioning of thequipment if the customer requests.
 Customers pay the charge of our technicians.
     1) Round-trip Airplane Tickets 
     2) Charges of transportation, accommodation and communication
     3) The allowance of the technicians is USD 100 per day for one person.
     4) An interpreter is needed.
 
3 English manual, Figuration drawing, and footing drawings are provided.
 

The use of original products manufacturer’s (OEM) part numbers or emblems , e.g. CASE® and John Deere® are for reference needs only and for indicating merchandise use and compatibility. Our organization and the detailed replacement components contained herein are not sponsored, accredited, or created by the OEM.

Sk610X2030 supplier made in China  replacement parts  in Belo Horizonte Brazil Automatic PP Film Open Mixing Mill Machine with top quality

Sk610X2030 supplier made in China  replacement parts  in Belo Horizonte Brazil Automatic PP Film Open Mixing Mill Machine with top quality

Tags